top of page
At Britannia Plant, we provide the zero-emission fleet required for modern Tier 1 infrastructure. Our electric range—including the Wacker Neuson TH412e, DW15e, and EZ-series excavators—is curated to support contractors with Section 172 reporting and SECR obligations. By utilising our battery-electric units, your firm can directly reduce Scope 3 supply chain emissions and align with Science Based Targets (SBTi). Perfect for indoor basement works and silent urban night-shifts.
At Britannia Plant, we provide the zero-emission fleet required for modern Tier 1 infrastructure. Our electric range—including the Wacker Neuson TH412e, DW15e, and EZ-series excavators—is curated to support contractors with Section 172 reporting and SECR obligations. By utilising our battery-electric units, your firm can directly reduce Scope 3 supply chain emissions and align with Science Based Targets (SBTi). Perfect for indoor basement works and silent urban night-shifts.

National Tracked Excavator Contract Hire | Fixed Cost

bottom of page